Inference cost and electricity estimates
Fleet routing history and Apps session details distinguish an API-equivalent estimate from actual billing. A signed-in app can report usage without reporting a charge. A zero legacy cost field, subscription, or local machine therefore does not establish free work. Existing records without the necessary receipts stay unavailable; they are not retroactively filled from requested models or current rates.
API-equivalent estimates
For Apps and federated OpenAI/Anthropic inference, the calculator uses the reported served model and a versioned observation of official API text prices. The quote travels with the estimate: vendor, exact model ID, currency, source URLs, checked date, refresh deadline, effective date when established, rates and context multipliers. Checking a page today does not establish the date its price took effect. Unknown model aliases remain unmapped.
Expand an estimate's assumptions and sources to inspect its retained rates, context multipliers and token categories. Unreported cache counts display as unavailable even when another category explicitly reports zero. Electricity details retain the utility, tariff, timezone, effective period and applicable rate bands alongside the energy source and allocation basis.
The initial catalog was checked on 22 October 2026 against the official
OpenAI pricing, the linked
model pages, and Anthropic pricing.
It covers only the exact IDs recorded in core/costestimate/prices.json.
This is a standard global text-token equivalent; service tiers, region
premiums, tools, storage, taxes and subscription allocation are excluded.
It does not claim those exclusions have zero cost.
Input is normalized to include uncached input, cache reads and cache writes. Known categories use their own rates. Missing cache counts or durations produce a bounded range instead of fabricated zeroes. Request context thresholds use that request's input count. Aggregate app/session totals cannot recover context brackets or each request's model; their estimate assumes the reported model for the aggregate and explicitly records that attribution limit. Mixed-model totals need per-model receipts before they can support a measured attribution claim.
Quotes become stale at their refresh deadline. A stale calculation retains its original source and is labelled stale; it does not silently become current. Refresh the reviewed catalog from official sources, preserve the checked and unknown effective dates, and run the calculator tests. Refreshing the catalog affects new calculations; a historical receipt keeps its original quote. Automatic vendor-price fetching is not implemented in this slice.
Machine electricity settings
Open Fleet → Machines → your machine → Settings → Electricity. Enter the machine's physical service address, city, region, postcode, country code and IANA timezone. The owner verifies the location and authorizes utility research. The street address is sealed in a separate owner-scoped profile, not placed on the shared machine registration. Reading or attesting this private input requires the owner's resolved user or personal-token authority; app-session, badge and delegated tool credentials cannot do it.
Verification starts an ordinary MemQL goal through available authorized inference doors. It receives locality and an optional provider, never the street address. It searches official service-area and tariff sources and submits bounded candidate evidence. A city alone does not prove which utility serves a property. When candidates are ambiguous, the owner chooses the applicable utility and tariff. If research is unavailable, enter the known provider and retry. This workflow does not authorize purchases or routing changes.
Research records source URLs, currency, timezone, effective dates, checked and refresh dates, and all applicable time-of-use or tier bands. The owner confirms the tariff. Changing location, provider or lookup authorization clears earlier findings and tariff selection. Delayed research for an old location revision is refused. Save failures retain the local draft; concurrent saves require reload.
Energy and uncertainty
Enter an explicit estimate of whole-machine watts during inference and its source, such as an owner estimate informed by a power-meter sample. For a local call with a measured routed-attempt wall duration (including dispatch/wait time), the calculator uses:
estimated kWh = watts × seconds ÷ 3,600,000estimated electricity cost = estimated kWh × applicable price per kWhThe calculation layer also accepts measured kWh with a source and allocation basis. This slice does not install a meter or collect automatic energy telemetry. No power evidence means unavailable electricity cost. Tokens do not determine energy. The router can read the caller's own machine profile; a borrowed machine without a readable owner-confirmed profile remains unavailable.
When time-of-use or household-tier allocation is unknown, the result spans the retained applicable bands. A tariff outside its effective period is unavailable; an overdue refresh is stale. Fixed/demand charges and taxes are excluded unless the rate evidence explicitly includes them. Whole-machine watts multiplied by several overlapping call durations must not be summed as measured consumption. Hardware purchase, cooling and other operating costs are outside this estimate.
The evaluation record protocol retains measurement scope, source, uncertainty and quote snapshots while excluding precise addresses. Public results require a reviewed export. Focused required-database checks cover sealed persistence, owner admission, research/confirmation, calculation and concurrent revisions in an isolated PostgreSQL/TimescaleDB instance. Native CI and a live owner-confirmation and utility-research exercise remain required before end-to-end verification.